How Many Days will the Installation be Completed?
  • Oct 15, 2021
  • |
  • View:40
  • |
  • The author:HUAYIN
  • Back to list

For 10 tons of equipment, how much do installation workers need? How many days will the installation be completed?...

How Many Days will the Installation be Completed?

(picture:How Many Days will the Installation be Completed?)

  The installation takes about one month, and it actually depends on the work efficiency of local workers. The types and numbers of workers at each stage are different, and we will give you a specific installation plan during the installation.

HUAYIN recommends How Many Days will the Installation be Completed? news for you. you can learn about our latest news, and you can also return to news homepage.
Related Products
  • Capacity model: 1Ton-15Ton
  • Raw materials: waste tyres/waste rubber
  • Output: 45% fuel oil, 30% carbon black, 10% steel wire, 10%-15% syngas
  • Capacity model: 1-15T
  • Raw materials: waste plastic
  • Output: fuel oil, carbon black, syngas
  • Capacity model: 1-15T
  • Raw materials: Oil Sludge
  • Output: Fuel oil, Ash, Flammable gas.
  • Capacity model: 5-30 ton/day
  • Raw materials: Waste tire, Worn rubber, Waste plastic, Medical wastes
  • Output: Fuel oil, Carbon black, Syngas
Need more information? Please leave us a message
Consult online
Copyright © 2021 by HUAYIN All rights reserved 豫ICP备10016095号
Online
此外,请将此代码粘帖到紧跟起始  标记之后的位置: